MARKETS
GOLD4,039.6-1.82%
SILVER51.40-2.45%
COPPER6.26-1.36%
PLATINUM1,541.3-1.31%
GDX86.97-4.91%
GDXJ106.91-5.44%
URA32.96-4.02%
LIT60.01-2.19%
REMX51.67-3.81%
Subscribe
Breaking Tambourah Targets Gold Continuity at Baxters South
Copper

Rio Tinto Sets Staged Path to 80% of Liamu Copper-Gold

Rio Tinto Sets Staged Path to 80% of Liamu Copper-Gold

Rio Tinto signed a binding agreement with LCL Resources to earn up to 80% of Papua New Guinea’s Liamu copper-gold project through staged exploration spending or resource-development milestones.

Rio Tinto has agreed to fund exploration at LCL Resources’ Liamu copper-gold project in Papua New Guinea, with a staged route to an 80% interest. The agreement puts drilling at the center of a partnership covering prospects where mineralisation has been identified at surface but remains untested underground.

The binding farm-in and joint venture agreement follows the companies’ Ono project arrangement announced in March 2026, making Liamu their second such partnership in PNG, according to Mining Technology. A farm-in allows a company to earn ownership by funding work rather than buying the entire interest upfront.

Exploration spending opens the route to control

Rio Tinto can earn an initial 51% interest by solely funding at least A$6 million ($4.2 million) of exploration over five years. That commitment includes a minimum of 3,000 meters of drilling, tying the first ownership stage to physical testing as well as expenditure.

The route from that initial stake to 80% offers alternatives. Rio Tinto must either fund an additional A$40 million of exploration or establish a JORC-compliant mineral resource containing at least 1 million tonnes of copper or copper equivalent and complete a scoping study. Copper equivalent expresses the combined value of different metals in copper terms.

Those alternatives distinguish spending from geological progress: the higher interest can be earned through further exploration funding, or through a qualifying resource and an early assessment of potential development. Signing the agreement does not itself establish either a mineral resource or a viable mine.

Surface results face their first drilling test

Liamu contains the Dada gold-copper porphyry discovery and the Ubei epithermal gold-copper prospect. Both have surface mineralisation, but neither has been drilled. The project lies within exploration licence EL2432 in central mainland PNG, east-southeast of Port Moresby.

Initial exploration will target anomalous, undrilled areas around Dada. Previous trenches returned 96 meters grading 0.41 grams per tonne of gold, and 19 meters grading 0.43 grams per tonne of gold and 0.16% copper.

LCL executive chairman Chris van Wijk described Dada as showing features of the upper levels of a porphyry system, with stockwork veining exposed over hundreds of meters. The intrusion thought to have caused the mineralisation has yet to be found, leaving an important geological target unresolved.

At Ubei, earlier rock-chip samples returned up to 367.7 grams per tonne of gold and 4.29% copper. Future exploration there will be reviewed within the first 12 months. Those sample results are not deposit-wide grades: drilling is needed to test how mineralisation extends beneath the surface and whether it has continuity.

LCL operates, while Rio retains takeover rights

LCL will operate during the farm-in period and receive a management fee of up to 10% of exploration expenditure. That gives it an operating role as Rio Tinto funds the work required to earn its initial interest.

Rio Tinto can elect to become operator before an annual work program and can take operational control if necessary. The arrangement therefore leaves LCL directing exploration initially without guaranteeing it will retain that role throughout the partnership. For both companies, the immediate test is whether drilling can turn encouraging surface evidence into a better-defined copper-gold system.

Key facts

  • Ownership opportunity: Rio Tinto (RIO) can earn up to 80% of Liamu.
  • Initial earn-in: At least A$6 million and 3,000 meters of drilling over five years for 51%.
  • Further earn-in: Additional A$40 million of exploration, or a qualifying resource and scoping study, to reach 80%.
  • Exploration status: Dada and Ubei have surface mineralisation but have not been drilled.

Sources

Photo: tshekisoboman · Pixabay Content License — source

Newsletter signup
Free newsletter
Mining Stocks in your inbox

Our picks and analysis on gold, silver, uranium, lithium and critical minerals.

Free. Unsubscribe from any email. See our privacy policy.